分组多变量轨迹模型共3篇
分组多变量轨迹模型:Error in gbmt:gbmt(x.names = var independent, unit = var_dependent, time = var time,Variable 'time' must be either numeric or date-决策链社区论坛

分组多变量轨迹模型:Error in gbmt:gbmt(x.names = var independent, unit = var_dependent, time = var time,Variable ‘time’ must be either numeric or date

报错原因:时间变量应该为连续变量或者日期变量解决方法:将时间变量转为连续型变量
空鱼O的头像-决策链社区论坛空鱼O31天前
06913
分组多变量轨迹模型:Error in dplyr:left join(source_df, post data final, by = var dependent) :
x$subject id`is a <double>.
v$subiect id`is a <character>.-决策链社区论坛

分组多变量轨迹模型:Error in dplyr:left join(source_df, post data final, by = var dependent) : x$subject id`is a . v$subiect id`is a .

报错原因:样本id变量,即标识单位变量的类型不安全,应该用string类型解决方法:把标识单位变量的类型转为string
空鱼O的头像-决策链社区论坛空鱼O35天前
0539
Error in gbmt::gbmt(x.names = var_independent, unit = var_dependent, time = var_time, :Unit '5' has duplicated time points-决策链社区论坛

Error in gbmt::gbmt(x.names = var_independent, unit = var_dependent, time = var_time, :Unit ‘5’ has duplicated time points

【报错原因】 数据问题,有重复值 【解决方法】 更换数据或变量
里里里里卡42的头像-决策链社区论坛里里里里卡422个月前
07311